Component 7; Unit 8: HIT System Planning, Acquisition, Installation, &Training: Practices to Support & Pitfalls to Avoid
Description:
Unit 8 is a unit where the core definitions and concepts of HIT systems planning, acquisition, installation, and training are presented. A variety of different settings will be used as examples in the unit, including small office practices, community clinics, acute care facilities, and skilled nursing facilities. Students will conduct simulated user needs analysis, and using the lab EHRS, will identify gaps in meeting those needs. Students will develop training plans for a variety of settings
Objectives:
- Conduct a basic user needs analysis for a given example situation.
- Create a plan for training users in a small office practice, a large community clinic, or a single unit in an ambulatory care setting.
- Identify several potential challenges that may emerge during installation and generate a strategy to solve (space, wiring, lack of basic computer literacy in staff, etc.).
Component 7; Unit 8; Lecture 8a comp7_unit8a_lecture_slides
Core Concepts and Implementation Challenges (16:28): 1) The Systems Development Process; 2) Business Process; 3)Training
Component 7; Unit 8; Lecture 8b comp7_unit8b_lecture_slides
Training and Key Success Factors (19:01)
Component 7; Unit 9: Poten